Trackway Case Studies

Chelsea Flower Show Poppies

RHS Chelsea Flower Show

In 4 weeks, LIONtrack has to carry an army of excavators, tele-handlers, lorries and cranes, culminating in the safety of 166,000 pedestrian visitors.

Latitudesign

Trackway underpins ‘floating’ Lake stage

LION underpins Latitude’s Lake Stage with underwater trackway installation.

Edenbrows13

Trackway for 500,000-tonne landslip repair

LIONtrack negotiates steep and twisting inclines through forest and farmland to provide safe transportation of plant and materials.

Queen’s 90th Birthday Celebration

“Your team are fantastic, nothing ever fazed them, they were always smiling and they delivered in every respect”

LAMMA show

Can I just say that the guys from office to site and in general did an excellent job, worked very hard and delivered to the shortened timescale.

The pioneers of Trackway, temporary access and ground stability

“We design and install medium to heavy-duty use, temporary roadway access and ground protection solutions. With minimal disruption to the ground and operations, we make the impassible, passible!”

The core LION team are THE pioneers of the temporary roadway industry and have continued to innovate the sector over the past 5 decades. Our portable roadway experience spans key sectors including; Events, Construction/Crane Access, Renewable Energy, Transmission, Rail and Film. Over the past 50 years our engineers have solved just about every portable roadway access challenge imaginable.

trophy icon

Winning an enviable suite of awards and Britain’s 31st fastest growing private company in 2014.

See our awards
two arrow icons

We have the capability to instal 40 to 43,000 panels, anywhere in Europe.

View our capability
lorry icon

Our vehicles are the latest
Euro 6 low-emission models and we harvest our own rainwater.

More on environmental concerns
environmental icon

LION track panels are 100% recycled materials AND are 100% recyclable again and again.

More on environmental concerns